High frequency welded steel pipe making machine, tube mill, pipe mill

FOB Reference Price:Get Latest Price
$50,000.00 - $1,000,000.00 / Sets | 1 Set/Sets whole line (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Production Capacity:
30-90m/min
Power(W):
75-332KW
Application:
Energy Supply Pipe
Place of Origin:
Jiangsu, China
Brand Name:
HS
Model Number:
custom made
Dimension(L*W*H):
as per actual design
Pipe size:
as per customer's requirements
Welder:
High frequency welding from Sanyi
Pipe Material:
Carbon Steel
Warranty:
one year
After-sales Service Provided:
Engineers available to service machinery overseas
Condition:
New
Voltage:
380V
Certification:
ISO 9001:2000
Type:
Pipe Mill
Weight:
as per actual design
Supply Ability
Supply Ability:
10 Set/Sets per Quarter line
Packaging & Delivery
Packaging Details
seaworthy nude packing, using steel wire and wood bock to fix the machine inside container, and using the film cover the machine for dustproof
Port
Shanghai port
Lead Time :
about 90--120 days according to the machine spec
 
Product Description

  


High frequency welded pipe making machine

 

Description

ZG12
tube mill line

ZG16
tube mill line

ZG25
tube mill line

ZG28
tube mill line

Diameter of welded tubes

Φ7-16mm

Φ8-25mm

Φ8-30mm

Φ10-38mm

Wall thickness of welded tubes

0.2-0.5mm

0.3-1.0mm

0.4-1.2mm

0.6-1.5mm

Speed of tube welding

30-100M/min

30-90M/min

30-90M/min

30-80M/min

Power of major motor

15KW

22KW

30KW

45KW

Power of high frequency welder

60KW

60KW

100KW

100KW

 

Description

ZG50 tube mill line

Diameter of welded tubes

Φ15-63.5mm

Wall thickness of welded tubes

0.8-2.5mm

Speed of tube welding

40-80M/min

Power of major motor

110KW

Power of high frequency welder

150KW

 

Description

ZG60 tube mill line

Diameter of welded tubes

Φ16-63.5mm

Wall thickness of welded tubes

1.0-3.0mm

Speed of tube welding

40-80M/min

Power of major motor

132KW

Power of high frequency welder

200KW

 

 

 

Basic componets & Work flow:
Uncoiler→Shearing and butt-welder→Vertical-type accumulator→Forming,welding,sizing machine→

Computer cutting saw→Run-out table

 

 

 

 Scope of Supply:

 

1)    Machine installation & test running for Buyer.

 

2)    Sufficiently train operation method to Buyer's operators.

 

3)    Reference document (in English): foundation drawing (including the arrangement of water, electricity and air etc.), circuit diagram and operation instruction, etc

 

4)    Additional Rollers for welded pipe will be ordered and designed according to type and specification provided by Buyer. Material: Cr12 

 

 

Sale conditions

 

1) Packing: Sea worthy packing, the mechanical parts are in nude pack, and the electrical arts and the spare parts are simply packed.

 

2) Quality Assurance: the Seller manufactures the equipment according to the relevant standards strictly and tests the equipment according to the technical documents.

 

3) Installation: three engineers will be dispatched to Buyer factory for installation and test running. The buyer should charge of return ticket, food and accommodation abroad and pay USD60/person/day for salary.

 

4) Warranty: we guarantee one year’s warranty after test running. (The matters caused by Buyer’s fault and the lack of Buyer’s maintenance shall not be covered). And we offer lifelong technical service and fast-response technical support to Buyer.

 

 

Scope of work excluded (Buyer scope)

 

1)    Foundation construction and electric appliance work, civil engineering and necessary materials.

 

2)    Machine to machine wire, mechanical pipe, water pipe;

 

3)    Lubricating oil, cycle oil, gear box oil, cooling circulating water

 

4)    D .Safety appliance, out of standard security items

 

5)    Test run material, magnetic rod, bearing etc. low value consumables.

 

6)    The buyer is responsible for power supply, water supply and gas supply to the equipment interface connector. Air compressor (1.5 cubic meters/minutes)

 

 

 

 
Packaging & Shipping

According to the line spec, FCL will be needed for the shipment.

Electrical equipment and rollers will be packed by wooden box for safety. Machine body is covered with plastic film.

 

 
Our Services

  

  • One stop service for customized machine
  • Overseas installation & operating training
  • One year warranty of the whole machine
  • Life-long technical support
 
FAQ

  

1. Machine installation & commissioning, training:

2-3 technicians will be dispatched to Buyer’s plant for installation & commissioning. Work period: in 25 days

The expense of round trip tickets, accommodation, safety and interpretation shall be covered by Buyer, additional pay allowance to the technicians.

2. warranty: one year

3. Price basis: FOB or CNF or CIF

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like