Steel Rack Roll Forming Machine

FOB Reference Price:Get Latest Price
$25,000.00 - $150,000.00 / Sets | 1 Set/Sets line (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Jiangsu, China
Brand Name:
HS
Model Number:
custom made
Inverter:
Mitsubishi
Forming stations:
16-22 depends on profile
Hole punching:
Mechanical press, optional
Forming power:
37-45KW
Cutting:
Hydraulic mold cutter with clean cutting
Rectification:
turkey head, 3 dimensional adjusting
Forming profile:
Racks
Shipment:
one 40 GP and one 20 GP containers
Transmission:
Gearbox transmission with universal joint
Forming thickness:
1.5-3.0mm
After-sales Service Provided:
Engineers available to service machinery overseas
Supply Ability
Supply Ability:
10 Set/Sets per Month line
Packaging & Delivery
Packaging Details
seaworthy nude packing, using steel wire and wood bock to fix the machine inside container, and using the film cover the machine for dustproof
Port
Shanghai
Lead Time :
about 45-60 days
Video Description
 
Product Description

 Steel Rack Roll Forming Machine


Processing flow

decoiler-----flatting------feeder-----punching-----guide straight roll forming -----cut-to-length-----product table.


Equipment composition

Decoiler, Guider, Feeder, Continuously punch, Forming machine, Cutter, Product table, Electrical control cabinet, etc.

 

Main data

1) forming thickness: 1-2.5mm, 3mm

2) forming shape: uprights, beams, collect panel

3) motor power: 30-45kw

4) forming stands: 15-24 according to profiles

5) cutting: flying saw or hydraulic mould

6) control system: PLC, touch screen operation

7) servo feeder with high speed punching online

 

 

 
Packaging & Shipping

seaworthy nude packing, using steel wire and wood bock to fix the machine inside container, and using the film cover the machine for dustproof

 

  

 
Our Services

 

  • One stop service for customized machine
  • Overseas installation & operating training
  • One year warranty of the whole machine
  • Life-long technical support
 
Company Information

  

 

 
FAQ

1. Machine installation & commissioning, training:

1-2 technicians will be dispatched to Buyer’s plant for installation & commissioning. Work period: in 7 days

The expense of round trip tickets, accommodation, safety and interpretation shall be covered by Buyer, additional pay allowance to the technicians.

2. warranty: one year

3. Price basis: FOB or CNF or CIF

  

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like