HF Welded pipe making machine

FOB Reference Price:Get Latest Price
$50,000.00 - $1,000,000.00 / Sets | 1 Set/Sets whole line (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Production Capacity:
30-100m/min
Power(W):
as per actual design
Application:
Energy Supply Pipe
Place of Origin:
Jiangsu, China
Brand Name:
HS
Model Number:
custom made
Dimension(L*W*H):
as per actual design
Pipe Material:
Carbon Steel
Warranty:
one year
After-sales Service Provided:
Engineers available to service machinery overseas
Condition:
New
Voltage:
380/415V
Certification:
ISO
Type:
Pipe Mill
Weight:
as per actual design
Supply Ability
Supply Ability:
10 Set/Sets per Quarter line
Packaging & Delivery
Packaging Details
seaworthy nude packing, using steel wire and wood block to fix the machine inside container, and using the film cover the machine for dustproof
Port
Shanghai port
Lead Time :
about 90--160 days according to the machine spec
 
Product Description

  

HF Welded pipe making machine

 

 

Description

ZG12
tube mill line

ZG16
tube mill line

ZG25
tube mill line

ZG28
tube mill line

Diameter of welded tubes

Φ7-16mm

Φ8-25mm

Φ8-30mm

Φ10-38mm

Wall thickness of welded tubes

0.2-0.5mm

0.3-1.0mm

0.4-1.2mm

0.6-1.5mm

Speed of tube welding

30-100M/min

30-90M/min

30-90M/min

30-80M/min

Power of major motor

15KW

22KW

30KW

45KW

Power of high frequency welder

60KW

60KW

100KW

100KW

 

 

 Description

ZG115 tube mill line

ZG165 tube mill line

ZG219 tube mill line

 Diameter of welded tubes

  Φ40-115mm

  Φ76-165mm

  Φ114-219mm

 Wall thickness of welded tubes

   1.5-5.0mm

  2.0-6.0mm

  3.0-8.0mm

 Speed of tube welding

  15-60M/min

  15-50M/min

  15-40M/min

 Power of major motor

  132KW×2

  185KW×2

  250KW×2

 Power of high frequency welder

  400KW

  600KW

  800KW

 

 

 

Basic componets & Work flow:
Uncoiler→Shearing and butt-welder→Vertical-type accumulator→Forming,welding,sizing machine→Computer cutting saw→Run-out table

 

 

 
Packaging & Shipping

  

According to the line spec, FCL will be needed for the shipment.

Electrical equipment and rollers will be packed by wooden box for safety. Machine body is covered with plastic film.

 
Our Services
  • One stop service for customized machine
  • Overseas installation & operating training
  • One year warranty of the whole machine
  • Life-long technical support
 
FAQ

1. Machine installation & commissioning, training:

1-2 technicians will be dispatched to Buyer’s plant for installation & commissioning. Work period: in 5 days

The expense of round trip tickets, accommodation, safety and interpretation shall be covered by Buyer, additional pay allowance to the technicians.

2. warranty: one year

3. Price basis: FOB or CNF or CIF

  

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like